Warren Gardens Coop — HUD inspection scores

HUD-assisted multifamily · 1 Rockland St, Roxbury, MA 02119

Latest published score NSPIRE
94 Passing
out of 100 Inspected June 24, 2025

Scores higher than 49% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 October 17, 2003 — scored 41.54 (REAC (UPCS)) June 16, 2004 — scored 64.5 (REAC (UPCS)) May 19, 2006 — scored 69.55 (REAC (UPCS)) September 5, 2007 — scored 74.46 (REAC (UPCS)) August 12, 2014 — scored 70 (REAC (UPCS)) September 22, 2015 — scored 68 (REAC (UPCS)) October 17, 2016 — scored 85b (REAC (UPCS)) June 5, 2023 — scored 47c (REAC (UPCS)) June 24, 2025 — scored 94 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
June 24, 2025 94 NSPIRE
June 5, 2023 47c REAC (UPCS)
October 17, 2016 85b REAC (UPCS)
September 22, 2015 68 REAC (UPCS)
August 12, 2014 70 REAC (UPCS)
September 5, 2007 74.46 REAC (UPCS)
May 19, 2006 69.55 REAC (UPCS)
June 16, 2004 64.5 REAC (UPCS)
October 17, 2003 41.54 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.