The Stearns — HUD inspection scores

HUD-assisted multifamily · 10 Temple Pl, Boston, MA 02111

Latest published score NSPIRE
92 Passing
out of 100 Inspected March 27, 2025

Scores higher than 38% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 November 2, 2001 — scored 99.01 (REAC (UPCS)) October 7, 2004 — scored 84.48 (REAC (UPCS)) November 20, 2006 — scored 59.31 (REAC (UPCS)) February 19, 2008 — scored 42.41 (REAC (UPCS)) September 2, 2008 — scored 90.35 (REAC (UPCS)) October 21, 2014 — scored 95 (REAC (UPCS)) September 19, 2017 — scored 85b (REAC (UPCS)) October 17, 2019 — scored 70c (REAC (UPCS)) · health or safety deficiency flagged March 27, 2025 — scored 92 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
March 27, 2025 92 NSPIRE
October 17, 2019 70c* REAC (UPCS)
September 19, 2017 85b REAC (UPCS)
October 21, 2014 95 REAC (UPCS)
September 2, 2008 90.35 REAC (UPCS)
February 19, 2008 42.41 REAC (UPCS)
November 20, 2006 59.31 REAC (UPCS)
October 7, 2004 84.48 REAC (UPCS)
November 2, 2001 99.01 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.