Stallion Pointe (rad) — HUD inspection scores

HUD-assisted multifamily · 9075 S Race St, Fort Worth, TX 76140

Latest published score NSPIRE
54 Failing
out of 100 Inspected December 23, 2025

Scores higher than 2% of Texas’s 1,953 currently scored properties · state median 92

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

What a failing score sets in motion

HUD refers a failing HUD-assisted property for enforcement: the owner surveys what the inspection found, corrects it, and documents both back to HUD. Inspections speed up too — scoring below 80 already means a roughly annual cycle. A failing score does not by itself close a building, end its subsidy, or mean anyone has to move; most failing properties are re-inspected and recover. More on failing scores.

If you live here: poor maintenance and health-or-safety problems in a HUD-assisted building can go to HUD’s Multifamily Housing Complaint Line, 1-800-685-8470, and this building’s published score is useful context in any complaint. A voucher unit’s own inspection is a separate system — check your own results.

100 80 60 0 2023 2024 2025 2026 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 September 13, 2022 — scored 92b (REAC (UPCS)) · health or safety deficiency flagged December 23, 2025 — scored 54 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
December 23, 2025 54 NSPIRE
September 13, 2022 92b* REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.