Promise Project, Inc. — HUD inspection scores

HUD-assisted multifamily · 5205 River Rd, Ellenwood, GA 30294

Latest published score NSPIRE
95 Passing
out of 100 Inspected September 20, 2024

Scores higher than 68% of Georgia’s 966 currently scored properties · state median 90

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2016 2018 2020 2022 2024 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 November 14, 2014 — scored 94a (REAC (UPCS)) January 31, 2018 — scored 97b (REAC (UPCS)) · health or safety deficiency flagged September 20, 2024 — scored 95 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
September 20, 2024 95 NSPIRE
January 31, 2018 97b* REAC (UPCS)
November 14, 2014 94a REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.