Massillon, Navarre And Canal Fulton — HUD inspection scores

Public housing · 560 Park St Nw, Navarre, OH 44662

Latest published score NSPIRE
59 Failing
out of 100 Inspected December 22, 2025

Scores higher than 2% of Ohio’s 1,740 currently scored properties · state median 92

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

What a failing score sets in motion

HUD refers a failing development for enforcement: the owner surveys what the inspection found, corrects it, and documents both back to HUD. Inspections speed up too — scoring below 80 already means a roughly annual cycle. A failing score does not by itself close a building, end its subsidy, or mean anyone has to move; most failing properties are re-inspected and recover. More on failing scores.

This development’s physical score also rolls uphill into Stark Metropolitian Housing Authority’s own assessment by HUD — its full portfolio shows how many of its developments are failing at once.

If you live here: conditions in your unit go first to the housing authority that runs it. If that goes nowhere, HUD’s Public and Indian Housing customer service line is 1-800-955-2232. A voucher unit’s own inspection is a separate system — check your own results.

100 80 60 0 2014 2016 2018 2020 2022 2024 2026 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 16, 2013 — scored 70 (REAC (UPCS)) July 2, 2014 — scored 63 (REAC (UPCS)) February 8, 2016 — scored 81 (REAC (UPCS)) January 15, 2020 — scored 78 (REAC (UPCS)) September 17, 2024 — scored 69 (NSPIRE) December 22, 2025 — scored 59 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
December 22, 2025 59 NSPIRE
September 17, 2024 69 NSPIRE
January 15, 2020 78 REAC (UPCS)
February 8, 2016 81 REAC (UPCS)
July 2, 2014 63 REAC (UPCS)
July 16, 2013 70 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.