Mass Pike Towers — HUD inspection scores

HUD-assisted multifamily · 360 Tremont St, Boston, MA 02116

Latest published score NSPIRE
99 Passing
out of 100 Inspected December 17, 2025

Scores higher than 90% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 26, 2002 — scored 99.8 (REAC (UPCS)) September 30, 2005 — scored 79.51 (REAC (UPCS)) July 25, 2007 — scored 94.08 (REAC (UPCS)) June 5, 2013 — scored 95 (REAC (UPCS)) July 28, 2016 — scored 98 (REAC (UPCS)) September 17, 2021 — scored 97b (REAC (UPCS)) December 17, 2025 — scored 99 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
December 17, 2025 99 NSPIRE
September 17, 2021 97b REAC (UPCS)
July 28, 2016 98 REAC (UPCS)
June 5, 2013 95 REAC (UPCS)
July 25, 2007 94.08 REAC (UPCS)
September 30, 2005 79.51 REAC (UPCS)
July 26, 2002 99.8 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.