Jaclen Towers — HUD inspection scores

HUD-assisted multifamily · 215 Rantoul St, Beverly, MA 01915

Latest published score NSPIRE
97 Passing
out of 100 Inspected February 22, 2024

Scores higher than 74% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 August 28, 2003 — scored 84.92 (REAC (UPCS)) August 2, 2006 — scored 93.3 (REAC (UPCS)) August 24, 2009 — scored 94.36 (REAC (UPCS)) September 25, 2015 — scored 96 (REAC (UPCS)) July 30, 2018 — scored 77 (REAC (UPCS)) August 27, 2019 — scored 87c (REAC (UPCS)) January 21, 2022 — scored 89c (REAC (UPCS)) February 22, 2024 — scored 97 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
February 22, 2024 97 NSPIRE
January 21, 2022 89c REAC (UPCS)
August 27, 2019 87c REAC (UPCS)
July 30, 2018 77 REAC (UPCS)
September 25, 2015 96 REAC (UPCS)
August 24, 2009 94.36 REAC (UPCS)
August 2, 2006 93.3 REAC (UPCS)
August 28, 2003 84.92 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.