Hammond2-chehalis West Assisted Living — HUD inspection scores

HUD-assisted multifamily · 478 Nw Quincy Pl, Chehalis, WA 98532

Latest published score NSPIRE
77 Watch
out of 100 Inspected December 12, 2025

Scores higher than 8% of Washington’s 669 currently scored properties · state median 92

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 16, 2009 — scored 86.05 (REAC (UPCS)) June 23, 2015 — scored 72 (REAC (UPCS)) October 6, 2016 — scored 94 (REAC (UPCS)) October 1, 2019 — scored 94 (REAC (UPCS)) December 7, 2022 — scored 95 (REAC (UPCS)) December 12, 2025 — scored 77 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
December 12, 2025 77 NSPIRE
December 7, 2022 95 REAC (UPCS)
October 1, 2019 94 REAC (UPCS)
October 6, 2016 94 REAC (UPCS)
June 23, 2015 72 REAC (UPCS)
July 16, 2009 86.05 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.