Franklin Park — HUD inspection scores

HUD-assisted multifamily · 20 Mount Bowdoin Ter, Boston, MA 02121

Latest published score NSPIRE
70 Watch
out of 100 Inspected September 16, 2024

Scores higher than 2% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 September 8, 2003 — scored 66.82 (REAC (UPCS)) December 9, 2004 — scored 85.48 (REAC (UPCS)) October 4, 2007 — scored 96.55 (REAC (UPCS)) May 16, 2014 — scored 87 (REAC (UPCS)) August 17, 2016 — scored 80 (REAC (UPCS)) August 6, 2019 — scored 60 (REAC (UPCS)) June 29, 2023 — scored 78c (REAC (UPCS)) September 16, 2024 — scored 70 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
September 16, 2024 70 NSPIRE
June 29, 2023 78c REAC (UPCS)
August 6, 2019 60 REAC (UPCS)
August 17, 2016 80 REAC (UPCS)
May 16, 2014 87 REAC (UPCS)
October 4, 2007 96.55 REAC (UPCS)
December 9, 2004 85.48 REAC (UPCS)
September 8, 2003 66.82 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.