Douglass Homes — HUD inspection scores

Public housing · 225 Silver Ct, Baltimore, MD 21231

Latest published score NSPIRE
59 Failing
out of 100 Inspected December 4, 2025

Scores higher than 4% of Maryland’s 816 currently scored properties · state median 91

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

What a failing score sets in motion

HUD refers a failing development for enforcement: the owner surveys what the inspection found, corrects it, and documents both back to HUD. Inspections speed up too — scoring below 80 already means a roughly annual cycle. A failing score does not by itself close a building, end its subsidy, or mean anyone has to move; most failing properties are re-inspected and recover. More on failing scores.

This development’s physical score also rolls uphill into Housing Authority Of Baltimore City’s own assessment by HUD — its full portfolio shows how many of its developments are failing at once.

If you live here: conditions in your unit go first to the housing authority that runs it. If that goes nowhere, HUD’s Public and Indian Housing customer service line is 1-800-955-2232. A voucher unit’s own inspection is a separate system — check your own results.

100 80 60 0 2000 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 June 9, 2000 — scored 39.1 (REAC (UPCS)) November 19, 2001 — scored 49.89 (REAC (UPCS)) November 27, 2002 — scored 73.26 (REAC (UPCS)) July 2, 2003 — scored 64.92 (REAC (UPCS)) August 25, 2004 — scored 82.59 (REAC (UPCS)) January 25, 2006 — scored 65.14 (REAC (UPCS)) November 2, 2007 — scored 82.81 (REAC (UPCS)) January 29, 2009 — scored 83.78 (REAC (UPCS)) June 24, 2013 — scored 48 (REAC (UPCS)) July 18, 2014 — scored 54 (REAC (UPCS)) July 14, 2015 — scored 60 (REAC (UPCS)) August 28, 2017 — scored 65 (REAC (UPCS)) October 17, 2018 — scored 51 (REAC (UPCS)) October 24, 2022 — scored 91 (REAC (UPCS)) December 4, 2025 — scored 59 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
December 4, 2025 59 NSPIRE
October 24, 2022 91 REAC (UPCS)
October 17, 2018 51 REAC (UPCS)
August 28, 2017 65 REAC (UPCS)
July 14, 2015 60 REAC (UPCS)
July 18, 2014 54 REAC (UPCS)
June 24, 2013 48 REAC (UPCS)
January 29, 2009 83.78 REAC (UPCS)
November 2, 2007 82.81 REAC (UPCS)
January 25, 2006 65.14 REAC (UPCS)
August 25, 2004 82.59 REAC (UPCS)
July 2, 2003 64.92 REAC (UPCS)
November 27, 2002 73.26 REAC (UPCS)
November 19, 2001 49.89 REAC (UPCS)
June 9, 2000 39.1 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.