Dos Pinos Housing Cooperative — HUD inspection scores

HUD-assisted multifamily · 2550 Sycamore Ln, Davis, CA 95616 · HUD id 800052363

Latest published score NSPIRE
92 out of 100 Inspected April 24, 2025

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

An inspection date a year or three back is normal: HUD inspects on a risk-based cycle, less often the better the last score, and this site reflects HUD's newest published file, refreshed weekly. How often HUD inspects

Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
April 24, 2025 92 NSPIRE
October 27, 2022 82c REAC (UPCS)
March 7, 2018 86c REAC (UPCS)
April 17, 2015 93 REAC (UPCS)
May 29, 2008 90.5 REAC (UPCS)
September 6, 2007 75.92 REAC (UPCS)
September 1, 2004 93.59 REAC (UPCS)
June 7, 2001 93.43 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.

Scores come from HUD USER's physical inspection scores datasets (public housing and multifamily, 2000 to present) and hud.gov's multifamily inspection report. The numbers are HUD's, not ours. A score below 60 obligates HUD to act, but a low score alone does not prove current conditions — inspections can be years apart.