Choctaw Electric Coop. Housing Authority — HUD inspection scores

Public housing · 174595 N 4393 Rd Unit 5, Nashoba, OK 74558

Latest published score NSPIRE
50 Failing
out of 100 Inspected October 10, 2024

Scores higher than 2% of Oklahoma’s 428 currently scored properties · state median 90

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2000 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 September 29, 2000 — scored 64.89 (REAC (UPCS)) November 19, 2001 — scored 90.43 (REAC (UPCS)) January 12, 2005 — scored 90.16 (REAC (UPCS)) April 5, 2007 — scored 71.35 (REAC (UPCS)) August 24, 2009 — scored 83.1 (REAC (UPCS)) October 1, 2015 — scored 92 (REAC (UPCS)) April 6, 2017 — scored 60 (REAC (UPCS)) October 10, 2024 — scored 50 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
October 10, 2024 50 NSPIRE
April 6, 2017 60 REAC (UPCS)
October 1, 2015 92 REAC (UPCS)
August 24, 2009 83.1 REAC (UPCS)
April 5, 2007 71.35 REAC (UPCS)
January 12, 2005 90.16 REAC (UPCS)
November 19, 2001 90.43 REAC (UPCS)
September 29, 2000 64.89 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.