Chicot Apartments (hap) — HUD inspection scores

HUD-assisted multifamily · 604 E Compress St, Eudora, AR 71640

Latest published score NSPIRE
98 Passing
out of 100 Inspected August 22, 2024

Scores higher than 73% of Arkansas’s 484 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 February 14, 2002 — scored 79.03 (REAC (UPCS)) June 20, 2003 — scored 79.04 (REAC (UPCS)) August 18, 2004 — scored 64.11 (REAC (UPCS)) August 8, 2005 — scored 79.19 (REAC (UPCS)) December 27, 2006 — scored 96.11 (REAC (UPCS)) January 27, 2014 — scored 90a (REAC (UPCS)) June 13, 2017 — scored 96b (REAC (UPCS)) August 22, 2024 — scored 98 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
August 22, 2024 98 NSPIRE
June 13, 2017 96b REAC (UPCS)
January 27, 2014 90a REAC (UPCS)
December 27, 2006 96.11 REAC (UPCS)
August 8, 2005 79.19 REAC (UPCS)
August 18, 2004 64.11 REAC (UPCS)
June 20, 2003 79.04 REAC (UPCS)
February 14, 2002 79.03 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.