Bedford Towers — HUD inspection scores

HUD-assisted multifamily · 231 Middle St, New Bedford, MA 02740

Latest published score NSPIRE
98 Passing
out of 100 Inspected November 18, 2024

Scores higher than 81% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 23, 2002 — scored 95.62 (REAC (UPCS)) September 28, 2005 — scored 79.61 (REAC (UPCS)) September 10, 2007 — scored 90.98 (REAC (UPCS)) July 24, 2013 — scored 98 (REAC (UPCS)) May 19, 2017 — scored 82 (REAC (UPCS)) June 27, 2019 — scored 95b (REAC (UPCS)) · health or safety deficiency flagged October 28, 2022 — scored 85c (REAC (UPCS)) · health or safety deficiency flagged November 18, 2024 — scored 98 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
November 18, 2024 98 NSPIRE
October 28, 2022 85c* REAC (UPCS)
June 27, 2019 95b* REAC (UPCS)
May 19, 2017 82 REAC (UPCS)
July 24, 2013 98 REAC (UPCS)
September 10, 2007 90.98 REAC (UPCS)
September 28, 2005 79.61 REAC (UPCS)
July 23, 2002 95.62 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.