Arbor Creek Family Apartments — HUD inspection scores

HUD-assisted multifamily · 8340 Elk Grove Florin Rd, Sacramento, CA 95829

Latest published score NSPIRE
90 Passing
out of 100 Inspected July 14, 2025

Scores higher than 28% of California’s 2,325 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2020 2021 2022 2023 2024 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 25, 2019 — scored 90b (REAC (UPCS)) August 22, 2022 — scored 96c (REAC (UPCS)) July 14, 2025 — scored 90 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
July 14, 2025 90 NSPIRE
August 22, 2022 96c REAC (UPCS)
July 25, 2019 90b REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.